From 1 - 10 / 27
  • Note: A more recent version of this product is available. This dataset contains spatial locations in point format as a representation of Electricity Transmission Substations in Australia. For government use only. Access through negotiation with Geoscience Australia

  • At the request of the Tasmanian Hydro-Electric Commission a geophysical survey was carried out along a tunnel line at Trevallyn, a suburb of Launceston, North Eastern Tasmania. The excavation of the Trevallyn tunnel is part of the Hydro-Electric Trevallyn Power Development project to utilise the water of the South Esk river for generation of electric power. The construction works are already well advanced. A dam is being built on the river at the Second Basin. Water from the catchment will be diverted through a tunnel two miles long to a power station situated at sea level on the Tamar River. A locality map is given in Plate 1. Three geophysical exploration methods, electrical, seismic and gravitational, were used to locate deeply weathered and fractured zones in the dolerite bedrock, through which the tunnel is being driven.

  • For the projected development of the hydroelectric power resources of the Laloki River, Papua, a diversion weir will be required. Two sites have been selected by the officers of the Department of Works and Housing, downstream from Rouna Falls and another site, upstream from the falls, which would be suitable for a large scale power development. An inspection of these sites was made in order to indicate any geological difficulties which may be expected. The situation, physiography, and geology of the proposed sites, as well as the suitability of these sites, are discussed in this report.

  • High voltage transmission towers are key linear assets that supply electricity to communities and key industries and are constantly exposed to wind effects where they traverse steep topography or open terrain. Lattice type high voltage transmission towers are highly optimised structures to minimise cost and reserve strength at design wind speeds (Albermani and Kitipornchai, 2003). The structures are tested under static loading conditions for specified load cases at the design stage. However, the interconnected nature of the lattice towers and conductors present a complex response under dynamic wind loading in service (Fujimura, el.al., 2007). The transmission tower's survival under severe wind and additional load transfer due to collapse of its neighbours is difficult to assess through modelling. Furthermore, the lack of data in the industry doesn't allow for a probabilistic analysis based on history (Abdallah, et.al., 2008). Hence, there is a need for developing an alternative methodology for analysing transmission tower collapse and survival of transmission lines subjected to cyclonic winds utilising design information, limited field data and industry expertise.

  • PowerPoint presentations presented at the NORTH QUEENSLAND SEISMIC AND MT WORKSHOP in Townsville, June 2009.

  • This point dataset contains the major airport fuel storage and supply facilities in Australia.

  • The possibility of diverting the Upper Snowy River to provide water for irrigation has been a subject of discussion since 1884. The Snowy Mountains Hydro-Electric Authority was constituted in 1949. As the body responsible for the detailed investigation of the geology of the area it was thought desirable to publish the geological work which has been done in the Snowy Mountains region. With the authority of the Under-Secretary of the Department of Mines, New South Wales, the reports by members of the Geological Survey of New South Wales are included together with reports by geologists of the Commonwealth Bureau of Mineral Resources, Geology and Geophysics. Reports included in this publications are: "Geology - Jindabyne to Murrumbidgee River", "Reconnaissance Survey of Dam Site at Geehi, Swampy Plain River, N.S.W", "Geological Reconnaissance of the Proposed Hydro-Electric Works in the Kosciusko Area", "Geological Reconnaissance - Eucumbene River to Tumut River", and "Geological Reconnaissance - Murrumbidgee - Tumut Area".

  • To provide the solar power industry with a data resource to allow them to assess the economic potential of a site for a solar power plant. Specifically under the Solar Flagship program.

  • The Paterson airborne electromagnetic (AEM) survey is Australia's first regional AEM survey, flown between September 2007 and August 2008 under the auspices of the Australian Government's Onshore Energy Security Program (OESP). The survey was flown over the Archean eastern Pilbara, the Palaeoproterozoic Rudall Complex and the Neoproterozoic Yeneena Basin (both of which comprise the Paterson Orogen) and on-lapping sediments of the Neoproterozoic-Paleozoic Officer Basin and Palaeozoic-Mesozoic Canning Basin. The survey was flown at line spacings of 6, 2 and 1 km and 200 m for a total area of 45,330 km2 targeting known mineral deposits and other highly prospective rocks under cover. The survey was designed to provide pre-competitive data to reduce exploration risk primarily for uranium but also for other metals as well as groundwater resources for local indigenous communities and mineral exploration.

  • Presented to the Association of Mining and Exploration Companies (AMEC), Perth, March 2007