From 1 - 10 / 492
  • South East Queensand (SEQ) 2009 LiDAR data was funded by Queensland Department of Environment and Resource management (DERM) , which was captured and delivered by AAMHatch between March 25th 2009 and June 9th 2009. The project area covering 5300 sqkm was divided into three sub areas, namely South East Queensland Priority Area, Gold Coast and the Balance of SEQ. Data acquisition and post-processing has been controlled to achieve a vertical accuracy witihn 0.15m (RMS, 68% CI) and horizontal accuracy within 0.45 m. Horizontal coordinates are based upon Map Grid of Australia (MGA) Zone 56 projection. Vertical coordinates are referenced to Australian Height Datum (AHD). The data was captured with point density of 2.5 points per square metre and the data is available as mass point files (ASCII, LAS) and ESRI GRID files with 1m grid spacing in 1km tiles and inundation contours (0.25m). A hydrologically conditioned and drainage enforced 2m DEM or HDEM has also been developed in 2010 as part of the Urban DEM project managed by the CRC for Spatial Information and Geoscience Australia. The HDEM was produced by SKM using the ANUDEM program. Hydrologic enforcement and conditioning has included the testing of data for sinks, the referencing of transport and hydrology vector layers for intersections and flow, and the use of high-resolution imagery for visual validation. The methodology for hydrologic enforcement has required deriving a stream network based on flow direction and accumulation, using TIN and ANUDEM processes to analyse sinks and artificial damming affects caused by objects such as roads, bridges and trees which have not been previously filtered. Break lines have been included via the insertion of culvert/drainage channels, which has been used to interpolate these features into the main DEM as descending grid values. All data are referenced to GDA94/MGA Zone 56.

  • Moreton Bay 2009 LiDAR data was captured over the Moreton Bay Regional Council area between March and June 2009. The data was acquired by AAM Hatch (now AAMGroup) and funded by Queensland and Commonwealth governments. The project area covering 2440sqkm is licenced for use by all Commonwealth, State and Local Government organisations. Data acquisition and post-processing has been controlled to achieve a vertical accuracy witihn 0.15m (RMS, 68% CI) and horizontal accuracy within 0.45 m. Horizontal coordinates are based upon Map Grid of Australia (MGA) Zone 56 projection. Vertical coordinates are referenced to Australian Height Datum (AHD). The data was captured with point density of 2.5 points per square metre and the data is available as mass point files (ASCII, LAS) and ESRI GRID files with 1m grid spacing in 1km tiles.

  • This project consists of data that has been reprocessed by RPS and AAM for the purpose of creating an improved Victorian coastal DEM including contours based on the original data acquired in 2007. The purpose of this project is to reclassify the original level 2 classification LiDAR data into level 3 for input to a higher accuracy ICSM Level 3 classification (Level 3 DEM). LiDAR (Light Detection and Ranging) is an airborne remote sensing technique for rapid collection of terrain data. The sensor used for this LiDAR project collected XYZ and Intensity data for first and last return by bouncing a pulse from the aircraft to the surface that enables the height and intensity values to be calculated. From the raw LiDAR data, a suite of elevation products was generated including DEM and Contours. Project Products: DEM, Contours, raw LiDAR.

  • Adelaide LiDAR 2008 data was flown by AAMHatch between 13th to 19th September 2008 as part of the Urban Digital Elevation Modelling in High Priority Areas Project funded by the Federal Department of Climate Change. Several data gaps existed in the intital survey due to operational instrumentation errors and a subsequent refly was conducted on 5th January 2009 to complete the dataset. The data was captured with point density of 0.8m point per square metre and overall vertical accuracy has been confirmed at <15cm (68% confidence level). The data are available as mass point files (LAS) comprising ground, thinned ground and non ground points in 2km tiles. A hydrologically conditioned and drainage enforced 2m DEM or HDEM has also been developed in 2010 as part of the Urban DEM project managed by the CRC for Spatial Information and Geoscience Australia. Hydrologic enforcement and conditioning has included the testing of data for sinks, the referencing of transport and hydrology vector layers for intersections and flow, and the use of high-resolution imagery for visual validation. The methodology for hydrologic enforcement has required deriving a stream network based on flow direction and accumulation, using TIN and ANUDEM processes to analyse sinks and artificial damming affects caused by objects such as roads, bridges and trees which have not been previously filtered. Break lines have been included via the insertion of culvert/drainage channels, which has been used to interpolate these features into the main DEM as descending grid values. The hydrologically enforced elevation model should be used for any water modelling. Adelaide Hydrological Enforced DEM(HDEM) 2008

  • The Busselton 2008 LiDAR data was captured over the Busselton region during February, 2008. The data was acquired by AAMHatch (now AAMGroup) and Fugro Spatial Solutions through a number of separate missions as part of the larger Swan Coast LiDAR Survey that covers the regions of Perth, Peel, Harvey, Bunbury and Busselton. The project was funded by Department of Water, WA for the purposes of coastal inundation modelling and a range of local and regional planning. The data are made available under licence for use by Commonwealth, State and Local Government. The data was captured with point density of 1 point per square metre and overall vertical accuracy has been confirmed at <15cm (68% confidence). The data are available as a number of products including mass point files (ASCII, LAS) and ESRI GRID files with 1m grid spacing. A 2m posting hydrologically enforced digital elevation model (HDEM) and inundation contours has also been derived for low lying coastal areas.

  • These datasets cover approximately 93 sq km within the Cook Shire Council in the vicinity and over the Town of Weipa and part of the adjoining Napranum Shire Council and are part of the 2010 Gulf LiDAR capture project. This project, undertaken by Vekta Pty Ltd on behalf of the Queensland Government captured highly accurate elevation data using LiDAR technology. Available dataset formats (in 1 kilometre tiles) are: - Classified las (LiDAR Data Exchange Format where strikes are classified as ground, vegetation or building) - 1 metre Digital Elevation Model (DEM) in ASCII xyz - 1 metre Digital Elevation Model (DEM) in ESRI grid - 1 metre Digital Elevation Model (DEM) in ASCII grid - 0.25 metre contours in ESRI Shape

  • These datasets cover all of the Yarrabah Shire Council and are part of the 2009 Tropical Coast LiDAR capture project. This project, undertaken by Fugro Spatial Solutions Pty Ltd on behalf of the Queensland Government captured highly accurate elevation data using LiDAR technology. Available dataset formats (in 2 kilometre tiles) are: - Classified las (LiDAR Data Exchange Format where strikes are classified as ground, non-ground or building) - 1 metre Digital Elevation Model (DEM) in ASCII xyz - 1 metre Digital Elevation Model (DEM) in ESRI ASCII grid - 0.25 metre contours in ESRI Shape

  • The 1 Second DSM Version 1.0 is a gridded digital surface model representing the radar reflective surface (bare earth, vegetation and built structures) as observed by the Shuttle Radar Topographic Mission in February 2000. It was derived primarily from the 1 second SRTM version 2 provided by DIGO, supported by the Geodata 9 Second DEM in void areas and the SRTM surface water database. Stripes and voids have been removed from the 1 second SRTM data to provide an enhanced and complete digital surface model for Australia and near-shore islands. The grid spacing is 1 second in longitude and latitude (approximately 30 metres).

  • These datasets cover approximately 14 sq km along the northern boundary of the Wujal Wujal Shire Council and are part of the 2009 North Queensland LiDAR capture project. This project, undertaken by Photomapping Services on behalf of the Queensland Government captured highly accurate elevation data using LiDAR technology. Available dataset formats (in 1 kilometre tiles) are: - Classified las (LiDAR Data Exchange Format where strikes are classified as ground, vegetation or building) - 1 metre Digital Elevation Model (DEM) in ASCII xyz - 0.25 metre contours in ESRI Shape

  • This project consists of data that has been reprocessed by RPS and AAM for the purpose of creating an improved Victorian coastal DEM including contours based on the original data acquired in 2007. The purpose of this project is to reclassify the original level 2 classification LiDAR data into level 3 for input to a higher accuracy ICSM Level 3 classification (Level 3 DEM). LiDAR (Light Detection and Ranging) is an airborne remote sensing technique for rapid collection of terrain data. The sensor used for this LiDAR project collected XYZ and Intensity data for first and last return by bouncing a pulse from the aircraft to the surface that enables the height and intensity values to be calculated. From the raw LiDAR data, a suite of elevation products was generated including DEM and Contours. Project Products: DEM, Contours, raw LiDAR.