From 1 - 10 / 95
  • Provides R codes for interpolation of unstructured point data

  • This job is part of the town capture program

  • Victoria Coast 2007-2008

  • This job was part of the Coastal capture program. It captures from the 10m contour interval to the adjoining southern and western jobs of Wooli & Grafton.

  • Brimbank LiDAR 2007

  • These datasets cover approximately 980 sq km in the western sector of the Burdekin Regional Council and are part of the 2011 Lower Burdekin LiDAR capture project. This project, undertaken by Fugro Spatial Solutions Pty Ltd on behalf of the Queensland Government captured highly accurate elevation data using LiDAR technology. Available dataset formats (in 1 kilometre tiles) are: - Classified las (LiDAR Data Exchange Format where strikes are classified as ground, non-ground or building) - 1 metre Digital Elevation Model (DEM) in ASCII xyz - 1 metre Digital Elevation Model (DEM) in ESRI ASCII grid - 0.25 metre contours in ESRI Shape

  • Australia wide mineralogical maps have recently been generated and released by CSIRO and Geoscience Australia using the 14 band satellite-borne ASTER imaging sensors. Seventeen map products related to surface composition have been produced for the geoscience community. Band parameters were developed based on spectral absorption features representing either abundance of mineral groups, specific minerals and their chemistry, vegetation cover or regolith related characteristics. A detailed study was undertaken, investigating the geoscience exploration capabilities of these newly released map products, individually, and integrated with airborne geophysics and digital elevation models over the Mt Fitton test site in northern Flinders Ranges, South Australia. This site includes the Mt Fitton talc deposits, gold prospects, and areas of hydrothermal activity and metasomatism.

  • As part of the standard town capture and requirement for high-res imagery to assist with cadastral upgrade in the Wellington Shire, the opportunity was taken to survey Yeoval

  • Melbourne 2007-2008

  • Completion of a pilot study over the Namoi and Murrumbidgee catchments was part of the 2012-13 project schedule between Bureau of Meteorology (Bureau) and Geoscience Australia. The purpose of the pilot was to consolidate four years of research and development of the 1 second SRTM DEM, ANUDEM Streams, and National Catchment Boundaries to enable GA operational capacity to recreate the foundation datasets for Geofabric Phase 3 deliverables. This report is aimed to highlight how successfully the process has worked, issues that have arisen and identify and develop future modifications of the methodology to enable the production of Phase 3 Geofabric products. This professional opinion has been created for the Bureau and the Geofabric Steering Committees for review of Phase 3 of the Geofabric.