From 1 - 7 / 7
  • This data package provides seismic interpretations that have been generated in support of the energy resource assessments under the Australia’s Future Energy Resources (AFER) project. Explanatory notes are also included. The AFER project is part of Geoscience Australia’s Exploring for the Future (EFTF) Program—an eight year, $225 million Australian Government funded geoscience data and precompetitive information acquisition program to inform decision-making by government, community and industry on the sustainable development of Australia's mineral, energy and groundwater resources. By gathering, analysing and interpreting new and existing precompetitive geoscience data and knowledge, Geoscience Australia is building a national picture of Australia’s geology and resource potential. This will help support a strong economy, resilient society and sustainable environment for the benefit of all Australians. The EFTF program is supporting Australia’s transition to a low emissions economy, industry and agriculture sectors, as well as economic opportunities and social benefits for Australia’s regional and remote communities. Further details are available at http://www.ga.gov.au/eftf. The seismic interpretations build on the recently published interpretations by Szczepaniak et al. (2023) by providing updated interpretations in the AFER Project area for the Top Cadna-owie (CC10) and Top Pre-Permian (ZU) horizons, as well as interpretations for 13 other horizons that define the tops of play intervals being assessed for their energy resource potential (Figure 1). Seismic interpretations for the AFER Project are constrained by play interval tops picked on well logs that have been tied to the seismic profiles using time-depth data from well completion reports. The Pedirka and Western Eromanga basins are underexplored and contain relatively sparse seismic and petroleum well data. The AFER Project has interpreted play interval tops in 41 wells, 12 seismic horizons (Top Cadna-owie and underlying horizons) on 238 seismic lines (9,340 line kilometres), and all 15 horizons on 77 recently reprocessed seismic lines (3,370 line kilometres; Figure 2). Note that it has only been possible to interpret the Top Mackunda-Winton, Top Toolebuc-Allaru and Top Wallumbilla horizons on the reprocessed seismic lines as these are the only data that provide sufficient resolution in the shallow stratigraphic section to confidently interpret seismic horizons above the Top Cadna-owie seismic marker. The seismic interpretations are provided as point data files for 15 horizons, and have been used to constrain the zero edges for gross-depositional environment maps in Bradshaw et al. (2023) and to produce depth-structure and isochore maps for each of the 14 play intervals in Iwanec et al. (2023). The data package includes the following datasets: 1) Seismic interpretation point file data in two-way-time for up to 15 horizons using newly reprocessed seismic data and a selection of publicly available seismic lines (Appendix A). 2) Geographical layers for the seismic lines used to interpret the top Cadna-owie and underlying horizons (Cadnaowie_to_TopPrePermian_Interpretation.shp), and the set of reprocessed lines used to interpret all 15 seismic horizons (All_Horizons_Interpretation.shp; Appendix B). These seismic interpretations are being used to support the AFER Project’s play-based energy resource assessments in the Pedirka and Western Eromanga basins.

  • <div>This document provides metadata for the gross depositional environment (GDE) interpretations that have been generated in support of the energy resource assessments under the Australia’s Future Energy Resources (AFER) project.&nbsp;&nbsp;</div><div>The AFER projects is part of Geoscience Australia’s Exploring for the Future (EFTF) Program—an eight year, $225 million Australian Government funded geoscience data and precompetitive information acquisition program to inform decision-making by government, community and industry on the sustainable development of Australia's mineral, energy and groundwater resources. By gathering, analysing and interpreting new and existing precompetitive geoscience data and knowledge, we are building a national picture of Australia’s geology and resource potential. This will help support a strong economy, resilient society and sustainable environment for the benefit of all Australians. The EFTF program is supporting Australia’s transition to a low emissions economy, industry and agriculture sectors, as well as economic opportunities and social benefits for Australia’s regional and remote communities. Further details are available at http://www.ga.gov.au/eftf.&nbsp;</div><div>The GDE data sets provide high level classifications of interpreted environments where sediments were deposited within each defined play interval in the Pedirka, Simpson and Western Eromanga basins. Twelve gross depositional environments have been interpreted and mapped in the study (Table 1). A total of 14 play intervals have been defined for the Pedirka, Simpson and Western Eromanga basins by Bradshaw et al. (2022, in press), which represent the main chronostratigraphic units separated by unconformities or flooding surfaces generated during major tectonic or global sea level events (Figure 1). These play intervals define regionally significant reservoirs for hydrocarbon accumulations or CO2 geological storage intervals, and often also include an associated intraformational or regional seal.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</div><div>GDE interpretations are a key data set for play-based resources assessments in helping to constrain reservoir presence. The GDE maps also provide zero edges showing the interpreted maximum extent of each play interval, which is essential information for play-based resource assessments, and for constructing accurate depth and thickness grids.&nbsp;&nbsp;</div><div>GDE interpretations for the AFER Project are based on integrated interpretations of well log and seismic data, together with any supporting palynological data. Some play intervals also have surface exposures within the study area which can provide additional published paleo-environmental data. The Pedirka, Simpson and Western Eromanga basins are underexplored and contain a relatively sparse interpreted data set of 42 wells and 233 seismic lines (Figure 2). Well and outcrop data provide the primary controls on paleo-environment interpretations, while seismic interpretations constrain the interpreted zero edges for each play interval. The sparse nature of seismic and well data in the study area means there is some uncertainty in the extents of the mapped GDE’s.&nbsp;&nbsp;</div><div>The data package includes the following datasets:&nbsp;&nbsp;</div><div>Play interval tops for each of the 42 wells interpreted – provided as an ‘xlsx’ file.&nbsp;</div><div>A point file (AFER_Wells_GDE) capturing the GDE interpretation for each of the 14 play intervals in each of the 42 wells – provided as both a shapefile and within the AFER_GDE_Maps geodatabase.&nbsp;</div><div>Gross depositional environment maps for each of the 14 play intervals (note that separate GDE maps have been generated for the Namur Sandstone and Murta Formation within the Namur-Murta play interval, and for the Adori Sandstone and Westbourne Formation within the Adori-Westbourne play interval) – provided as both shapefiles and within the AFER_GDE_Maps geodatabase.&nbsp;</div><div>&nbsp;</div><div>These GDE data sets are being used to support the AFER Project’s play-based energy resource assessments in the Western Eromanga, Pedirka and Simpson basins.&nbsp;</div><div><br></div>

  • This report presents palynological data compiled and analysed as part of the National Groundwater Systems (NGS) Project. NGS is part of Exploring for the Future (EFTF)—an eight year, $225 million Australian Government funded geoscience data and information acquisition program focused on better understanding the potential mineral, energy and groundwater resources across Australia. This study builds on previous work (Hannaford et al., 2022) undertaken as part of the ‘Assessing the Status of Groundwater in the Great Artesian Basin’ project, commissioned by the Australian Government through the National Water Infrastructure Fund – Expansion. The study undertaken by MGPalaeo, in collaboration with Geoscience Australia, examined an additional 688 boreholes across the GAB and compiled 149 new palynological summary sheets having Jurassic‒Cretaceous succession, with reviewed palynology data (down to total depth). The combined borehole palynological data examined from this study and the previous GAB work (Hannaford et al., 2022) is compiled in Appendix B4. The combined dataset totals 1,394 boreholes examined and 652 with palynology in the stratigraphic interval of interest, 102 of these boreholes contained Cenozoic palynology relevant to the Lake Eyre Basin. This information has been used to revise stratigraphic correlations across the GAB (Norton & Rollet, 2022 and 2023). Initial review of the stratigraphy in the Lake Eyre Basin (LEB) compiled existing palynology from outcrop, mineral and petroleum boreholes. An additional 28 boreholes in the Upper Darling Floodplain region were examined, 16 of which contained relevant palynology. The main palynological data infill in the GAB and LEB region during this follow-up study focused on: 1. Collecting, processing and analysing new biostratigraphic data on 149 key boreholes particularly across the Eromanga and Surat basins boundary. The study focussed on integrating data in New South Wales from the southern Surat Basin and central Eromanga Basin. 2. Further palynological data infill and palynological analysis on 15 samples from 7 boreholes in the western Eromanga Basin to assess difficulties in correlating the stratigraphy across the Algebuckina Sandstone. 3. Compiling existing analyses and update any historical palynological data in the Lake Eyre Basin to reflect the latest zonation scheme developed in this study. The new palynological data combined with new zircon data from other studies in the Carpentaria and Surat basins (Foley et al., 2020, 2021, 2022; La Croix et al., 2022, respectively) provides information on the tie to the geological timescale and help refine the chronostratigraphic chart that summarises stratigraphic correlations across the Carpentaria, Surat and Eromanga basins of Hannaford et al. (2022). All boreholes were examined outside of the Cooper and Bowen basins boundaries with selected boreholes around transects defined for stratigraphic correlation review through the Cooper and Bowen basin outlines (Norton & Rollet, 2022 and 2023). As a result, most of the remaining unreviewed palynological data lies within the Cooper and Bowen basins. The results of the palynology data infill in the western Eromanga Basin, in South Australia and Northern Territory, show that the Algebuckina Sandstone section is dominated by clean sandstone and so the cuttings samples were also dominated by sand. Although attempts were made to concentrate the shale from the cuttings in the thicker shale mid formation, this did not yield results, due to the amount of caved Cretaceous material. An initial assessment of the Lake Eyre Basin palynological data and zonation scheme was undertaken using information derived from water, mineral and petroleum boreholes. This provides an initial state of knowledge for the Lake Eyre Basin that can be built on in the future. Recommendations are provided for further studies to build a better understanding of the stratigraphy in the Great Artesian and Lake Eyre basins.

  • The Browse Basin hosts considerable gas and condensate resources, including the Ichthys and Prelude fields that are being developed for liquefied natural gas (LNG) production. Oil discoveries are sub-economic. This multi-disciplinary study integrating sequence stratigraphy, palaeogeography and geochemical data has mapped the spatial and temporal distribution of Jurassic to earliest Cretaceous source rocks. This study allows a better understanding of the source rocks contribution to the known hydrocarbon accumulations and charge history in the basin, including in underexplored areas. The Jurassic to earliest Cretaceous source rocks have been identified as being the primary sources of the gases and condensates recovered from accumulations in the Browse Basin as follows: - The Lower–Middle Jurassic J10–J20 (Plover Formation) organic-rich source rocks have been deposited along the northeast-southwest trending fluvial-deltaic system associated with a phase of pre-breakup extension. They have charged gas reservoired within J10–J20 accumulations on the Scott Reef Trend and in the central Caswell Sub-basin at Ichthys/Prelude, and in the Lower Cretaceous K40 supersequence on the Yampi Shelf. - Late Jurassic–earliest Cretaceous J30–K10 source rocks are interpreted to have been deposited in a rift, north of the Scott Reef Trend and along the Heywood Fault System (e.g. Callovian–Tithonian J30–J50 supersequences, lower Vulcan Formation). The J30–K10 shales are believed to have sourced wet gas reservoired in the K10 sandstone (Brewster Member) in the Ichthys/Prelude and Burnside accumulations, and potentially similar plays in the southern Caswell Sub-basin. - The organic-rich source rocks observed in the Heywood Graben may be associated with deeper water marine shales with higher plant input into the isolated inboard rift. They are the potential source of fluids reservoired within the Crux accumulation, which has a geochemical composition more closely resembling a petroleum system in the southern Bonaparte Basin.

  • <div>This data package provides depth and isochore maps generated in support of the energy resource assessments under the Australia’s Future Energy Resources (AFER) project. Explanatory notes are also included.</div><div><br></div><div>The AFER project is part of Geoscience Australia’s Exploring for the Future (EFTF) Program—an eight year, $225 million Australian Government funded geoscience data and precompetitive information acquisition program to inform decision-making by government, community and industry on the sustainable development of Australia's mineral, energy and groundwater resources. By gathering, analysing and interpreting new and existing precompetitive geoscience data and knowledge, Geoscience Australia is building a national picture of Australia’s geology and resource potential. This will help support a strong economy, resilient society and sustainable environment for the benefit of all Australians. The EFTF program is supporting Australia’s transition to a low emissions economy, industry and agriculture sectors, as well as economic opportunities and social benefits for Australia’s regional and remote communities. Further details are available at http://www.ga.gov.au/eftf.</div><div><br></div><div>The depth and isochore maps are products of depth conversion and spatial mapping seismic interpretations by Szczepaniak et al. (2023) and Bradshaw et al. (2023) which interpreted 15 regional surfaces. These surfaces represent the top of play intervals being assessed for their energy resource potential (Figure 1). These seismic datasets were completed by play interval well tops by Bradshaw et al. (in prep), gross depositional environment maps, zero edge maps by Bradshaw et al. (in prep), geological outcrop data as well as additional borehole data from Geoscience Australia’s stratigraphic units database.</div><div><br></div><div>Depth and isochore mapping were undertaken in two to interactive phases; </div><div><br></div><div>1.&nbsp;&nbsp;&nbsp;&nbsp;A Model Framework Construction Phase – In this initial phase, the seismic interpretation was depth converted and then gridded with other regional datasets. </div><div><br></div><div>2.&nbsp;&nbsp;&nbsp;&nbsp;A Model Refinement and QC Phase – This phase focused on refining the model and ensuring quality control. Isochores were generated from the depth maps created in the previous phase. Smoothing and trend modelling techniques were then applied to the isochore to provide additional geological control data in areas with limited information and to remove erroneous gridding artefacts.&nbsp;</div><div><br></div><div>The final depth maps were derived from isochores, constructing surfaces both upward and downward from the CU10_Cadna-owie surface, identified as the most data-constrained surface within the project area. This process, utilizing isochores for depth map generation, honours all the available well and zero edge data while also conforming to the original seismic interpretation.</div><div><br></div><div>This data package includes the following datasets: </div><div><br></div><div>1)&nbsp;&nbsp;&nbsp;Depth maps, grids and point datasets measured in meters below Australian Height Datum (AHD, for 15 regional surfaces (Appendix A). </div><div>2)&nbsp;&nbsp;&nbsp;Isochore maps, grids and point datasets measured in meters, representing 14 surfaces/play internals (Appendix B).</div><div>&nbsp;</div><div>These depth and isochore maps are being used to support the AFER Project’s play-based energy resource assessments in the Pedirka and western Eromanga basins, and will help to support future updates of 3D geological and hydrogeological models for the Great Artesian Basin by Geoscience Australia.</div><div><br></div>

  • This report presents a stratigraphic review of some key boreholes across the Jurassic-Cretaceous Eromanga, Surat and Carpentaria basins that form the groundwater Great Artesian Basin (GAB), as well as across the overlying Cenozoic Lake Eyre Basin (LEB), completed during the National Groundwater Systems (NGS) Project. The NGS Project is part of Exploring for the Future (EFTF)—an eight year, $225 million Australian Government funded geoscience data and information acquisition program focused on better understanding the potential mineral, energy and groundwater resources across Australia. The study presented here builds on previous work (Norton & Rollet, 2022a) undertaken as part of the ‘Assessing the Status of Groundwater in the Great Artesian Basin’ Project, commissioned by the Australian Government through the National Water Infrastructure Fund – Expansion. Although not intended to be a major re-interpretation of existing data, this stratigraphy review updates stratigraphic picks where necessary to obtain a consistent interpretation across the study area, based on the refined geological and hydrostratigraphical framework developed through this project. Problems and inconsistencies in the input data or current interpretations have been highlighted to suggest where further studies or investigations may be useful. This study includes Phase 2 of the National Groundwater Systems Project, which was undertaken by Catherine Jane Norton in collaboration with Geoscience Australia; and compiled, processed and correlated a variety of borehole log data to review the stratigraphy and improve the understanding of distribution and characteristics of Jurassic and Cretaceous sediments across the Eromanga and Surat basins and overlying LEB. To complement the previous 322 key boreholes compiled in Phase 1 (Norton & Rollet, 2022) additional stratigraphic correlations have been made between geological units of similar age (constrained using palynological data) from 706 key boreholes along 35 regional transects across the GAB and from 406 key boreholes along 20 regional transects across the central LEB. Also included in this study is Phase 3 in-fill work of four additional transects, extending the study further south in New South Wales, to tie in to the Cenozoic of the Murray Basin. This later phase 3 of the project also included a review and quality control of approximately 2,572 central LEB boreholes, and the addition of 278 boreholes in the GAB in southern Queensland and New South Wales. Phase 3 also expanded on the results used for mapping regional sand/shale ratios that began in the previous phase (Evans et al., 2020; Norton & Rollet, 2022a). Normalised Gamma Ray (GR) calculations have now been made for 1,778 LEB boreholes and 676 GAB boreholes spanning the entire sequence from the surface, through the Cenozoic and down to the base Jurassic unconformity. The previous phase, mentioned above, concentrated on either just the LEB or the GAB intervals from Cadna-owie Formation to base Jurassic. An additional 17 transects in the LEB and 27 transects in the GAB were created to visualise the lithological variation. The distribution of generalised sand/shale ratios are used to estimate the thickness of sand and shale in different formations, with implications for formation porosity and the hydraulic properties of aquifers and aquitards. This study fills data gaps identified in the previous study (Norton & Rollet, 2022) and refines the regional distribution of lithological heterogeneity in each hydrogeological unit, contributing to an improved understanding of connectivity within and between aquifers. The datasets compiled and examined in this study are in Appendix A. Attempts were made to standardise lithostratigraphic units, which are currently described using varying nomenclature, to produce a single chronostratigraphic chart across the entirety of the GAB and LEB basins. The main stratigraphic correlation infill in the GAB and LEB regions focused on: • The transition between the Eromanga and Surat basins in New South Wales and the tie-in to existing transects in Queensland and South Australia, • The Eromanga Basin in South Australia and Queensland and the tie-in to Phase 1 transects, • The central Eromanga Basin and Frome Embayment areas, extending the GAB units to the overlying Lake Eyre Basin stratigraphy to better assess potential connectivity between these basins, • The transition between the Lake Eyre and Murray Basins in the Upper Darling Floodplain (UDF) area in New South Wales and the tie-in to Phase 1 transects in New South Wales. This report and associated data package provide a data compilation on 706 and 278 key boreholes in the Surat and Eromanga basins respectively, to assist in updating the geological framework for the GAB and LEB. Recommendations are provided for further studies to continue refining the understanding of the stratigraphy in the Great Artesian and Lake Eyre basins.

  • The document summarises new seismic interpretation metadata for two key horizons from Base Jurassic to mid-Cretaceous strata across the western and central Eromanga Basin, and the underlying Top pre-Permian unconformity. New seismic interpretations were completed during a collaborative study between the National Groundwater Systems (NGS) and Australian Future Energy Resources (AFER) projects. The NGS and AFER projects are part of Exploring for the Future (EFTF)—an eight year, $225 million Australian Government funded geoscience data and precompetitive information acquisition program to inform decision-making by government, community and industry on the sustainable development of Australia's mineral, energy and groundwater resources. By gathering, analysing and interpreting new and existing precompetitive geoscience data and knowledge, we are building a national picture of Australia’s geology and resource potential. This will help support a strong economy, resilient society and sustainable environment for the benefit of all Australians. The EFTF program is supporting Australia’s transition to a low emissions economy, industry and agriculture sectors, as well as economic opportunities and social benefits for Australia’s regional and remote communities. Further details are available at http://www.ga.gov.au/eftf. The seismic interpretations build on previous work undertaken as part of the ‘Assessing the Status of Groundwater in the Great Artesian Basin’ (GAB) Project, commissioned by the Australian Government through the National Water Infrastructure Fund – Expansion (Norton & Rollet, 2022; Vizy & Rollet, 2022; Rollet et al., 2022; Rollet et al., in press.), the NGS Project (Norton & Rollet, 2023; Rollet et al., 2023; Vizy & Rollet, 2023) and the AFER Project (Bradshaw et al., 2022 and in press, Bernecker et al., 2022, Iwanec et al., 2023; Iwanec et al., in press). The recent iteration of revisions to the GAB geological and hydrogeological surfaces (Vizy & Rollet, 2022) provides a framework to interpret various data sets consistently (e.g., boreholes, airborne electromagnetic, seismic data) and in a 3D domain, to improve our understanding of the aquifer geometry, and the lateral variation and connectivity in hydrostratigraphic units across the GAB (Rollet et al., 2022). Vizy and Rollet (2022) highlighted some areas with low confidence in the interpretation of the GAB where further data acquisition or interpretation may reduce uncertainty in the mapping. One of these areas was in the western and central Eromanga Basin. New seismic interpretations are being used in the western Eromanga, Pedirka and Simpson basins to produce time structure and isochore maps in support of play-based energy resource assessment under the AFER Project, as well as to update the geometry of key aquifers and aquitards and the GAB 3D model for future groundwater management under the NGS Project. These new seismic interpretations fill in some data and knowledge gaps necessary to update the geometry and depth of key geological and hydrogeological surfaces defined in a chronostratigraphic framework (Hannaford et al., 2022; Bradshaw et al., 2022 and in press; Hannaford & Rollet, 2023). The seismic interpretations are based on a compilation of newly reprocessed seismic data (Geoscience Australia, 2022), as part of the EFTF program, and legacy seismic surveys from various vintages brought together in a common project with matching parameters (tying, balancing, datum correcting, etc.). This dataset has contributed to a consolidated national data coverage to further delineate groundwater and energy systems, in common data standards and to be used further in integrated workflows of mineral, energy and groundwater assessment. The datasets associated with the product provides value added seismic interpretation in the form of seismic horizon point data for two horizons that will be used to improve correlation to existing studies in the region. The product also provides users with an efficient means to rapidly access a list of core data used from numerous sources in a consistent and cleaned format, all in a single package. The following datasets are provided with this product: 1) Seismic interpretation in a digital format (Appendix A), in two-way-time, on key horizons with publically accessible information, including seismic interpretation on newly reprocessed data: Top Cadna-owie; Base Jurassic; Top pre-Permian; 2) List of surveys compiled and standardised for a consistent interpretation across the study area (Appendix B). 3) Isochore points between Top Cadna-owie and Base Jurassic (CC10-LU00) surfaces (Appendix C). 4) Geographical layer for the seismic lines compiled across Queensland, South Australia and the Northern Territory (Appendix D). These new interpretations will be used to refine the GAB geological and hydrogeological surfaces in this region and to support play-based energy resource assessments in the western Eromanga, Pedirka and Simpson basins.