From 1 - 5 / 5
  • <div>High purity quartz (HPQ) is the only naturally occurring and economically viable source for the production of silicon. Silicon is a critical mineral, and a key component in modern technologies such as semiconductors and photovoltaic cells. Critical minerals support the move towards a greater reliance on electrification, renewable energy sources and economic security. The global transition to net zero carbon emissions means there is a growing need for new discoveries of HPQ to supply the silicon production chain. High purity quartz deposits are identified in a multitude of geological settings, including pegmatites, hydrothermal veins, sedimentary accumulations and quartzite; however, deposits of sufficient volume and quality are rare. Quartz is abundant throughout Australia, but the exploration and discovery of HPQ occurrences is notably under-reported, making assessment of the HPQ potential in Australia extremely difficult. This paper presents a much-needed summary of the state of the HPQ industry, exploration and deposit styles in Australia. <b>Citation:</b> Jennings, A., Senior, A., Guerin, K., Main, P., & Walsh, J. (2024). A review of high-purity quartz for silicon production in Australia. <i>Australian Journal of Earth Sciences</i>, 1–13. https://doi.org/10.1080/08120099.2024.2362296

  • Green steel, produced using renewable energy and hydrogen, presents a promising avenue to decarbonize steel manufacturing and expand the hydrogen industry. Australia, endowed with abundant renewable resources and iron ore deposits, is ideally placed to support this global effort. This paper's two-step analytical approach offers the first comprehensive assessment of Australia's potential to develop green steel as a value-added export commodity. The Economic Fairways modelling reveals a strong alignment between prospective hydrogen hubs and current and future iron ore operations, enabling shared infrastructure development and first-mover advantages. By employing a site-based system optimization that integrates both wind and solar power sources, the cost of producing green steel could decrease significantly to around AU$900 per tonne by 2030 and AU$750 per tonne by 2050. Moreover, replacing 1% of global steel production would require 35 GW of well-optimized wind and solar photovoltaics, 16 GW of hydrogen electrolysers, and 1000 square kilometres of land. Sensitivity analysis further indicates that iron ore prices would exert a long-term influence on green steel prices. Overall, this study highlights the opportunities and challenges facing the Australian iron ore industry in contributing to the decarbonization of the global steel sector, underscoring the crucial role of government support in driving the growth and development of the green steel industry. <b>Citation:</b> Wang C et al., Green steel: Synergies between the Australian iron ore industry and the production of green hydrogen, <i>International Journal of Hydrogen Energy,</i> Volume 48, Issue 81, 1 October 2023, Pages 32277-32293, ISSN 0360-3199. https://doi.org/10.1016/j.ijhydene.2023.05.041

  • <div>Critical minerals are the minerals and elements essential for modern technologies, economies and national security. However, the supply chains of these minerals may be vulnerable to disruption thereby making the study of these minerals, from source to product, of primary importance. </div><div><br></div><div>The global transition to net-zero emissions is driving accelerated consumption of critical minerals, particularly driven by the increase in demand for technologies such as solar photovoltaics (PV) and semiconductors (Department of Industry, Science and Resources [DISR], 2022; 2023). In parallel, the phasing out of, for example, traditional machinery and manufacturing processes reliant on hydrocarbon resources (Ali et al., 2017; Bruce et al., 2021; International Energy Agency [IEA], 2021; 2023; Skirrow et al., 2013) is further adding to the global demand. High Purity Quartz (HPQ) forms just one of these critical minerals, and is the primary raw material for the production of High Purity Silica (HPS) and Silicon (Si) for use in products ranging from solar PVs to semiconductors. </div><div><br></div><div>The current list of minerals classified as critical is now up to 31 (Department of Industry, Science and Resources [DISR], 2022; 2023). This diversity of critical minerals is also promoting a new focus on the exploration for i) new styles of mineralisation that might host sufficient volumes of critical minerals, and ii) a re-examination of existing minerals systems knowledge in order to help mineral explorers make new discoveries to help support the increasing demand. </div><div><br></div><div>At present, the main global suppliers of HPQ are the United States, Canada, Norway, Brazil, Russia and India (Pan et al., 2022). In Australia, there has been a paucity of exploration and development of HPQ mineral deposits and, despite the potential that Australia holds for the exploration and discovery of potentially significant HPQ occurrences, Simcoa Operations Pty Ltd. (Figure 1) represents the only operator currently mining HPQ, and the only manufacturer of high purity silicon in Australia (Simcoa, 2020). </div><div><br></div><div>Australia is well-positioned to incentivise the exploration, discovery and supply of raw materials, and significantly expand onshore silicon production capacity (PricewaterhouseCoopers, 2022). Research presented here highlights the opportunity that Australia has in making a positive contribution to meeting the global demand for HPQ required for high-technology applications and the transition to a net zero economy.&nbsp;</div><div><br></div>Abstract presented at the 2024 Annual Geoscience Exploration Seminar (AGES)

  • Geoscience Australia and Monash University have produced a series of renewable energy capacity factor maps of Australia. Solar photovoltaic, concentrated solar power, wind (150 metre hub height) and hybrid wind and solar capacity factor maps are included in this dataset. All maps are available for download in geotiff format. Solar Photovoltaic capacity factor map The minimum capacity factor is <10% and the maximum is 25%. The map is derived from Bureau of Meteorology (2020) data. The scientific colour map is sourced from Crameri (2018). Concentrated Solar Power capacity factor map The minimum capacity factor is 52% and the maximum is 62%. The map is derived from Bureau of Meteorology (2020) data. Minimum exposure cut-off values used are from International Renewable Energy Agency (2012) and Wang (2019). The scientific colour map is sourced from Crameri (2018). Wind (150 m hub height) capacity factor map The minimum capacity factor is <15% and the maximum is 42%. The map is derived from Global Modeling and Assimilation Office (2015) and DNV GL (2016) data. The scientific colour map is sourced from Crameri (2018). Hybrid Wind and Solar capacity factor maps Nine hybrid wind and solar maps are available, divided into 10% intervals of wind to solar ratio (eg. (wind 40% : solar 60%), (wind 50% : solar 50%), (wind 60% : solar 40%) etc.). The maps show the capacity factor available for electrolysis. Wind and solar plants might be oversized to increase the overall running time of the hydrogen plant allowing the investor to reduce electrolyser capital expenditures for the same amount of output. Calculations also include curtailment (or capping) of excess electricity when more electricity is generated than required to operate the electrolyser. The minimum and maximum capacity factors vary relative to a map’s specified wind to solar ratio. A wind to solar ratio of 50:50 produces the highest available capacity factor of 64%. The maps are derived from Global Modeling and Assimilation Office (2015), DNV GL (2016) and Bureau of Meteorology (2020) data. The scientific colour map is sourced from Crameri (2018). See the ‘Downloads' tab for the full list of references. Disclaimer The capacity factor maps are derived from modelling output and not all locations are validated. Geoscience Australia does not guarantee the accuracy of the maps, data, and visualizations presented, and accepts no responsibility for any consequence of their use. Capacity factor values shown in the maps should not be relied upon in an absolute sense when making a commercial decision. Rather they should be strictly interpreted as indicative. Users are urged to exercise caution when using the information and data contained. If you have found an error in this dataset, please let us know by contacting clientservices@ga.gov.au. This dataset is published with the permission of the CEO, Geoscience Australia.

  • High-purity quartz (HPQ) is the only naturally occurring and economically viable source for the production of silicon. Silicon is a critical mineral, and a key component in modern technologies such as semiconductors and photovoltaic cells. Critical minerals support the move towards a greater reliance on electrification, renewable energy sources and economic security. The global transition to net zero carbon emissions means there is a growing need for new discoveries of HPQ to supply the silicon production chain. HPQ deposits are identified in a multitude of geological settings, including pegmatites, hydrothermal veins, sedimentary accumulations and quartzite; however, deposits of sufficient volume and quality are rare. Quartz is abundant throughout Australia, but the exploration and discovery of HPQ occurrences are notably under-reported, making assessment of the HPQ potential in Australia extremely difficult. This paper presents a much-needed summary of the state of the HPQ industry, exploration and deposit styles in Australia. KEY POINTS: 1. High-purity quartz (HPQ) is a key material for the manufacture of photovoltaic cells, semiconductors and other high-technology applications. 2. HPQ can be recovered from a variety of different source rocks in a range of geological settings. 3. Currently, the HPQ industry in Australia is under-utilised for high-technology applications, and historical exploration and mining records are under-reported and opaque. 4. This review presents an outline of the characteristics, processing requirements and end uses of HPQ, and a summary of the operations, deposits, exploration targets and known occurrences of HPQ in Australia. <b>Citation:</b> Jennings, A., Senior, A., Guerin, K., Main, P., & Walsh, J. (2024). A review of high-purity quartz for silicon production in Australia. <i>Australian Journal of Earth Sciences</i>, 1–13. https://doi.org/10.1080/08120099.2024.2362296