From 1 - 10 / 16
  • This animation shows how Airborne Electromagnetic Surveys Work, when conducted by a rotary wing (helicopter) aircraft. It is part of a series of Field Activity Technique Engagement Animations. The target audience are the communities that are impacted by our data acquisition activities. There is no sound or voice over. The 2D animation includes a simplified view of what AEM equipment looks like, what the equipment measures and how the survey works.

  • This animation shows how Magnetotelluric (MT) Surveys Work. It is part of a series of Field Activity Technique Engagement Animations. The target audience are the communities that are impacted by our data acquisition activities. There is no sound or voice over. The 2D animation includes a simplified view of what magnetotelluric (MT) stations and equipment looks like what the equipment measures and how the survey works.

  • <p>The AusAEM Year 1 NT/QLD Airborne Electromagnetic Survey covers the Newcastle Waters and Alice Springs 1:1 Million map sheets in the Northern Territory and the Normanton and Cloncurry 1:1 Million map sheets in Queensland. CGG Aviation (Australia) Pty. Ltd. flew the 67,700-line kilometre survey between 2017 and 2018 using the TEMPEST® airborne electromagnetic system. Flown at 20-kilometre line spacing, data were acquired and processed under contract to Geoscience Australia. <p>This data package supersedes and replaces two earlier releases: June 11, 2018, and December 2018 (eCatID 120948) with revised calibrations and processing. Along with the regionally spaced (20 km) flight lines, it now includes 1,500 line kilometres of infill flying that was funded by private exploration companies and not previously released in view of time-bounded confidentiality agreements. The survey was commissioned by Geoscience Australia as part of the Exploring for the Future (EFTF) program. The EFTF program is led by Geoscience Australia (GA), in collaboration with the Geological Surveys of the Northern Territory, Queensland, South Australia and Western Australia, and is investigating the potential mineral, energy and groundwater resources in northern Australia and South Australia. The EFTF is a four-year $100.5 million investment by the Australian Government in driving the next generation of resource discoveries in northern Australia, boosting economic development across this region. This Data Release (Phase 1) Package contains the final survey deliverables produced by the contractor CGG, including: <p>a) The operations and processing report. <p>b) Final processed electromagnetic, magnetic and elevation point located line data. <p>c) Final processed electromagnetic, magnetic and elevation grids. <p>d) Conductivity estimates generated by the EM Flow® conductivity depth-imaging algorithm. <p>e) Graphical multi-plots of line data and EM Flow® conductivity sections. <p>f) Graphical stacked EM Flow® conductivity sections. <p>g) ESRI shape-files containing the flight line locations. <p>An updated release package (Phase 2), which contains results from our in-house inversion of the EM data (from this Phase 1 release), which includes the regional and infill areas are downloadable from the link provided in the Downloads tab.

  • The AusAEM Year 1 NT/QLD Airborne Electromagnetic Survey covers the Newcastle Waters and Alice Springs 1:1 Million map sheets in the Northern Territory, plus the Normanton and Cloncurry 1:1 Million map sheets in Queensland. The survey was flown at 20 kilometre line spacing and entails approximately 60,000 line kilometres of data in total. The data were acquired in 2017 and 2018 by CGG Aviation (Australia) Pty. Ltd. (CGG), under contract to Geoscience Australia, using the TEMPEST® airborne electromagnetic system. The data were also processed by CGG. This Tranche 1 data release package only contains approximately the first one third (19,500 line kilometres) of the survey data that were acquired between August 4 and October 7, 2017. The AusAEM Year 1 NT/QLD survey also included over 1,500 line kilometres of infill flying, that was funded by private exploration companies, in certain infill blocks within the survey area. These infill blocks and data are not part of this data release due to confidentiality agreements. The survey was commissioned by Geoscience Australia as part of the Exploring for the Future (EFTF) program. The EFTF program is led by Geoscience Australia (GA), in collaboration with the Geological Surveys of the Northern Territory, Queensland, South Australia and Western Australia, and is investigating the potential mineral, energy and groundwater resources in northern Australia and South Australia. The EFTF is a four-year $100.5 million investment by the Australian Government in driving the next generation of resource discoveries in northern Australia, boosting economic development across this region. This Data Release Package (Tranche 1, Phase 1) contains the final survey deliverables produced by the contractor CGG, including: (a) the operations and processing report, (b) final processed electromagnetic, magnetic and elevation point located line data, (c) final processed electromagnetic, magnetic and elevation grids, (d) conductivity estimates generated by the EM Flow® conductivity depth imaging algorithm, (e) graphical multiplots of line data and EM Flow® conductivity sections, (f) graphical stacked EM Flow® conductivity sections, (h) ESRI shapefiles containing the flight line locations. Future data release packages will contain data flown after October 7 2017 (Tranche 2, etc.) and further derived products (Phase 2, etc.).

  • The product consists of 8,595 line kilometres of time‐domain airborne electromagnetic (AEM) geophysical data acquired over part of the Musgrave Province in South Australia. This product release also includes electrical conductivity depth images derived from the dataset, and the survey operations and processing report. The data were acquired using the airborne High Moment TEMPEST® electromagnetic and magnetic system, which covered a survey area that includes the south western portion of the WOODROFFE 1:250K Map Sheet (Crombie, Carbeena and western half of the Eunyarinna 1:100K Map Sheets); the northwestern portion of the LINDSAY 1:250K Map Sheet (northern half of the Moombunya and Moolalpinna 1:100K map sheets and northwestern quarter of the Willinna 1:100K map sheet). The survey lines where oriented N-S and flown 2km line apart. The survey was funded by the Government of South Australia, as part of the Plan for Accelerating Exploration (PACE) Initiative, through the Department of State Development, (DSD). The survey was managed by Geoscience Australia as part of a national collaborative framework project agreement with SA. The principal objective of this project was to capture a baseline geoscientific dataset to provide further information on the geological context and groundwater resource potential, of the central part of the South Australian Musgrave Province. Geoscience Australia contracted CGG Aviation (Australia) Pty to acquire High Moment TEMPEST® electromagnetic and magnetic data, between August and September 2016. The data were processed and modelled by CGG using its in‐house processing conductivity depth transform techniques. The Musgrave Province in far north of South Australia is one of the last true exploration frontier areas in Australia, which extends into Northern Territory and Western Australia. The Musgrave Province is composed primarily of granulite facies quartzo-feldspathic metasedimentary and meta-igneous rocks, and includes a suite of layered mafic to ultramafic intrusions known as the Giles Complex. This geological setting has proven to be highly prospective for Ni-Cu-PGE mineral systems in the bordering states. A good example of this is the discovery of the Nebo and Babel nickel-copper-PGE sulphide deposits in 2000, followed by a subsequent number of other nickel (Ni), copper (Cu) and gold (Au) discoveries. In South Australia, major discoveries have eluded mineral explorers and exploration activity has fallen behind that of the Northern Territory and Western Australia. This divergence is largely due to issues around land access and a lack of contemporary precompetitive geoscientific information and data. The limited surface mapping combined with extensive regolith cover and incomplete geophysical, geochemical and geochronological data sets make it difficult for new explorers to fully appreciate the full economic potential of the Musgrave Province. The regional AEM survey data will be used to inform the distribution of cover sequences that obscure the basement geology and provide insight into the variation and characteristics of the overlaying sequences. The increased definition in the distribution of cover sequences and their variation and characteristics of the overlaying sequences will allow explorers to better assess exploration opportunities in the area. The new AEM data should also assist in the definition of the groundwater resource potential of the region and help characterise the pre-Pliocene palaeovalley systems known to exist in the region. The selection of the survey area was undertaken through a consultative process involving the CSIRO, Geological Survey of South Australia and the exploration companies currently active in the region (including industry survey partner PepinNini Minerals Ltd). The data will be available from Geoscience Australia’s web site free of charge. It will also be available through the South Australian Government’s SARIG website at https://map.sarig.sa.gov.au. The data will also feed into the precompetitive exploration workflow developed and executed by the GSSA and inform a new suite of value-added products directed at the exploration community.

  • <p>Geoscience Australia commissioned the AusAEM Year 1 NT/QLD survey as part of the Exploring for the Future (EFTF) program, flown over parts of the Northern Territory and Queensland. The EFTF program is led by Geoscience Australia (GA), in collaboration with the Geological Surveys of the Northern Territory, Queensland, South Australia and Western Australia. The program was designed to investigate the potential mineral, energy and groundwater resources in northern Australia and South Australia. <p>The survey was flown during the 2017-2018 field season, using the TEMPEST® airborne electromagnetic (AEM) system operated by CGG Aviation (Australia) Pty. Ltd under contract to Geoscience Australia. AusAEM Year 1 was acquired with a 20-kilometre line separation and collected over 60,000 line kilometres of data in total. The AusAEM Year 1 NT/QLD survey also includes over 1,500 line kilometres of infill flying, which, was funded by private exploration companies in certain infill blocks within the survey area. The data from these infill blocks are now part of Geoscience Australia release to the public domain, for use in the minerals, energy and groundwater sectors. <p> Previously Released data (Phase 1) <p>In December 2018, we released a package, which contains data from the AusAEM Year 1 NT/QLD Airborne Electromagnetic Survey Phase 1. <p>This data package, with eCat ID 124092 titled “AusAEM Year 1 NT/QLD Airborne Electromagnetic Survey, TEMPEST® airborne electromagnetic data and Em Flow® conductivity estimates”. The package contains a) survey logistics and processing report, b) final processed electromagnetic, magnetic and elevation point located line data, c) processed electromagnetic, magnetic and elevation grids, d) point located conductivity estimates from EM Flow®, e) multi-plots of line data and conductivity sections, all produced by the contractor CGG Aviation (Australia) Pty. These products are downloadable from Geoscience Australia’s website: (See http://www.ga.gov.au/metadata-gateway/metadata/record/gcat_124092). <p>The data provides new insights into vast areas in Northern Australia that have not been extensively explored previously. <p>Current Release (Phase 2) <p>This Phase 2 data release package contains results from inverting the electromagnetic data in the Phase 1 release. The inversion results were generated using Geoscience Australia's sample-by-sample layered-earth (1D) inversion, a deterministic regularized gradient-based algorithm, which we call GALEISBS (Brodie, 2016). <p>For the inversion of TEMPEST AEM data we have conventionally inverted the total (primary plus secondary) measured X-and Z-component data simultaneously to produce a single smooth layered conductivity model. To achieve convergence and derive an acceptable model and acceptable data misfits, we have found that it is necessary to solve for three geometry parameters; (1) Transmitter (Tx) –Receiver (Rx) horizontal in-line and 2) vertical separations and 3) the receiver pitch. This is the case even with the new Rx bird IMU measurements and calibrated data (Ley-Cooper et.al, 2019.). <p>We have extended the GALEISBS functionality to allow inversion of the vector sum of the X- and Z-component data. The rationale of modifying the algorithm is to eliminate the need to solve for Rx pitch, since the vector sum of the X- and Z-component data are insensitive to the Rx pitch. In doing this, we are gaining some robustness by not having to solve for one of the geometry parameters; however, the trade-off is that we are in essence losing the information implicit in the vector component data. <p>The inversions we deliver here we derived from a recently implemented XZ–vector-sum inversion, described in Ley-Cooper et.al, 2019. <p>The GALEISBS inversion products are available for download in parts based on the type of derived product. These are zipped into the following three files: <p>1. galeisbs_vector_sum_point_located_data_ascii.zip <p>2. galeisbs_vector_sum_point_located_data_geosoft.zip <p>3. galeisbs_vector_sum_sctions.zip <p>4. galeisbs_vector_sum_gocad_sgrids.zip

  • This animation shows how Airborne Electromagnetic Surveys Work. It is part of a series of Field Activity Technique Engagement Animations. The target audience are the communities that are impacted by our data acquisition activities. There is no sound or voice over. The 2D animations include a simplified view of what AEM equipment looks like, what the equipment measures and how the survey works.

  • <div><strong>Yathong, Forbes, Dubbo, and Coonabarabran Airborne Electromagnetic Survey Blocks.</strong></div><div><br></div><div>Geoscience Australia (GA), in collaboration with the Geological Survey of New South Wales (GNSW), conducted an airborne electromagnetic (AEM) survey from April to June 2023. The survey spanned from the north-eastern end of the Yathong-Ivanhoe Trough and extended across the Forbes, Dubbo, and Coonabarabran regions of New South Wales.&nbsp;A total of 15, 090-line kilometres of new AEM and magnetic geophysical data were acquired. This survey was entirely funded by&nbsp;GSNSW and GA managed acquisition, quality control, processing, modelling, and inversion of the AEM data.</div><div><br></div><div>The survey was flown by Xcalibur Aviation (Australia) Pty Ltd using a 6.25 Hz HELITEM® AEM system. The survey blocks were flown at 2500-metre nominal line spacings, with variations down to 100 metres in the Coonabarabran block. It was flown following East-West line directions. Xcalibur also processed the acquired data. This data package includes the acquisition and processing report, the final processed AEM data, and the results of the contractor's conductivity-depth estimates. The data package also contains the results and derived products from a 1D inversion by Geoscience Australia with its own inversion software.</div><div><br></div><div>The survey will be incorporated and become part of the national AusAEM airborne electromagnetic acquisition program, which aims to provide geophysical information to support investigations of the regional geology and groundwater.</div><div><br></div><div><strong>The data release package contains:</strong></div><div><br></div><div>1. A data release package <strong>summary PDF document</strong></div><div>2. The <strong>survey logistics and processing report</strong> and HELITEM® system specification files</div><div>3. <strong>Final processed point located line data</strong> in ASEG-GDF2 format for the five areas</div><div> -final processed dB/dt electromagnetic, magnetic and elevation data</div><div> -final processed B field electromagnetic, magnetic and elevation data</div><div><strong> <em>Conductivity estimates generated by Xcalibur’s inversion&nbsp;</em></strong></div><div> -point located conductivity-depth line data output from the inversion in ASEG-GDF2 format</div><div> -graphical (PDF) multiplot conductivity stacks and section profiles for each flight line</div><div> -graphical (PNG) conductivity sections for each line</div><div> -grids generated from the Xcalibur’s inversion in ER Mapper® format (layer conductivities slices, DTM, X & Z component for each of the 25 channels, time constants, TMI)</div><div>4.<strong> ESRI shape and KML</strong> (Google Earth) files for the flight lines and boundary</div><div>5<strong>. Conductivity estimates generated by Geoscience Australia's inversion&nbsp;</strong></div><div> -point located line data output from the inversion in ASEG-GDF2 format</div><div> -graphical (pdf) multiplot conductivity sections for each line</div><div> -georeferenced (PNG) conductivity sections (suitable for pseudo-3D display in a 2D GIS)</div><div> -GoCAD™ S-Grid 3D objects (suitable for various 3D packages)</div><div> -Curtain image conductivity sections in log & liner colour stretch (suitable 3D display in GA’s EarthSci)</div><div><br></div><div><strong>Directory structure</strong></div><div>├── <strong>01_Report</strong></div><div>├── <strong>02_XCalibur_delivered</strong></div><div>│&nbsp;&nbsp; ├── * survey_block_Name</div><div>│ ├── cdi</div><div>│ │ ├── sections</div><div>│ │ └── stacks</div><div>│ ├── grids</div><div>│ │ ├── cnd</div><div>│ │ ├── dtm</div><div>│ │ ├── emxbf</div><div>│ │ ├── emxdb</div><div>│ │ ├── emxff</div><div>│ │ ├── emxzbf</div><div>│ │ ├── emzdb</div><div>│ │ ├── time_constant</div><div>│ │ └── tmi</div><div>│ ├── located_data</div><div>│ ├── maps</div><div>│ └── waveform</div><div>│&nbsp;&nbsp; </div><div>├── <strong>03_Shape&kml</strong></div><div>└── <strong>04_GA_Layer_Earth_inversion</strong></div><div> ├── * survey_block_Name</div><div> ├── GA_georef_sections</div><div> │ ├── linear-stretch</div><div> │ └── log-stretch</div><div> ├── GA_Inverted_conductivity_models</div><div> ├── GA_multiplots</div><div> └── GA_sgrids</div><div> </div> <b>Final Processed point located line data is available on request from clientservices@ga.gov.au - Quote eCat# 149118</b>

  • This web service delivers the geographical extents and descriptive metadata of geophysical datasets from all surveys conducted or managed by Geoscience Australia and its predecessor agencies, as well as from State and Territory geological survey agencies. Datasets include gravity, magnetic, radiometric, and electromagnetic data, and elevation data collected during geophysical surveys.

  • AusAEM-WA, Southwest-Albany Airborne Electromagnetic Survey Blocks:: SkyTEM® airborne electromagnetic data and GALEI inversion conductivity estimates The accompanying data package, titled “AusAEM-WA, Southwest-Albany Airborne Electromagnetic Survey Blocks:: SkyTEM® airborne electromagnetic data and GALEI inversion conductivity estimates”, was released on 4 November 2021 by Geoscience Australia (GA) and the Geological Survey of Western Australia. The data represents the first phase of the AusAEM2020 (WA) survey flown with a with a rotary aircraft contracted to Geoscience Australia, using the SkyTEM® airborne electromagnetic system. The survey was flown at a 20-kilometre nominal line spacing over the most south-western part and down to the southern coast of Western Australia. The area encompasses close to 12,500 line kilometres of newly acquired airborne electromagnetic geophysical data. This package contains the total (~12,500) of survey data which have been quality-controlled, processed, modelled and inverted both by the contractor and by GA. The survey was divided in four blocks, flown east-west and north-south direction. Since the survey covers two standard UTM zones 50 and 51, wherever projected Map Grid of Australia (MGA) easting and northing coordinates are used they are referenced to MGA Zone 50. All four block’s projected grid coordinates have been supplied in GDA2020 MGA Zone 50 datum, and contain the geodetic latitude and longitude WGS84 coordinate fields Geoscience Australia and Western Australia (Department of Mines, Industry Regulation and Safety) commissioned the AusAEM 2020 survey as part of the national airborne electromagnetic acquisition program, to complete 20km line separation AEM coverage over WA. The program is designed to deliver freely available pre-competitive geophysical data to assist in the investigation and discovery of potential mineral, energy and groundwater resources within Australia. Funding for the survey came from the Western Australian government’s Exploration Incentive Scheme. Geoscience Australia managed the survey data acquisition, processing, contracts, quality control of the survey and generated the inversion products included in the data package. The data release package contains 1. A data release package summary PDF document. 2. The survey logistics and processing report. 3. KML and Shapefiles for the regional flight lines. 4. Final processed point located line data in ASEG-GDF2 format. 5. Conductivity estimates generated by SkyTEM’s Workbench. 6. Conductivity estimates and products (suitable for various 3D packages) generated by Geoscience Australia's Layered Earth Inversion algorithm.