1981
Type of resources
Keywords
Publication year
Scale
Topics
-
Legacy product - no abstract available
-
Legacy product - no abstract available
-
The Steering Committee met on 3rd June in Canberra, and one of the matters agreed upon was that a field inspection of parts of the Basin should be held for geologists and hydrogeologists working on the Project, mainly to discuss stratigraphic correlation problems and, as well, hydrogeological aspects. Detailed planning for the field inspection, scheduled to begin early in October, and preceded by a one-day seminar, was completed. Work on a preliminary groundwater model of the whole Basin at the Geological Survey of Victoria has resulted in the development of a model to the operational stage. At BMR the compilation of available geological and geophysical data has continued steadily, and by the end of the year it is expected that all bores from which stratigraphic information has been obtained will have been plotted, and preparation of structure contour maps can begin.
-
Legacy product - no abstract available
-
Legacy product - no abstract available
-
Legacy product - no abstract available
-
J54/B1-112 Vertical scale: 2000
-
Legacy product - no abstract available
-
Legacy product - no abstract available
-
Legacy product - no abstract available