Upper Burdekin Groundwater Project
Type of resources
Keywords
Publication year
Topics
-
This report presents key results from the Upper Burdekin Groundwater Project conducted as part of Exploring for the Future (EFTF)—an eight year Australian Government funded geoscience data and information acquisition program. The first four years of the Program (2016–20) aimed to better understand the potential mineral, energy and groundwater resources in northern Australia. The Upper Burdekin Groundwater Project focused on the McBride Basalt Province (MBP) and Nulla Basalt Province (NBP) in the Upper Burdekin region of North Queensland. It was undertaken as a collaborative study between Geoscience Australia and the Queensland Government. This document reports the key findings of the project, as a synthesis of the hydrogeological investigation project and includes maps and figures to display the results.
-
This data release contains accurate positional data for groundwater boreholes in terms of horizontal location as well as elevation of the top of casing protectors. Twenty-four boreholes located in the Nulla and McBride basalt provinces have had DGPS survey results compiled and are presented. Using 95% confidence intervals, the horizontal uncertainties are less than 1.2m and vertical uncertainties less than 0.9m. These results are a substantial improvement, particularly on the uncertainty of elevations, and as such allow water levels need to be compared between bores on a comparable datum, to enable a regional hydrogeological understanding. Quantifying the uncertainties in elevation data adds robustness to the analysis of water levels across the region rather than detracting from it.
-
This technical report details the methods and results the drilling programs of the Upper Burdekin Groundwater Project conducted as part of Exploring for the Future (EFTF)—an eight year, $225 million Australian Government funded geoscience data and information acquisition program focused on better understanding the potential mineral, energy and groundwater resources across Australia. This report was written by Queensland Government collaborators in the Department of Environment and Science, and is published here as supplied to Geoscience Australia at the conclusion of the project. The drilling program itself was conducted by the Department of Environment and Science as part of the Upper Burdekin Groundwater Project. A total of 17 holes were drilled in 2017-18 at 13 sites with a total combined depth of 943.2 metres. These comprise selected locations across both the Nulla Basalt Province and McBride Basalt Province. A network of 15 monitoring bores were constructed with two test holes backfilled and decommissioned.