COSPPac
Type of resources
Keywords
Publication year
Topics
-
<div>Australia has been supporting 13 Pacific Island countries (PICs) to measure, record and analyse long-term sea level and land motion for over 25 years. This is known as the Pacific Sea Level and Geodetic Monitoring (PSLGM) project which is funded by Australian Aid under the Climate and Oceans Support Program in the Pacific (COSPPac). </div><div>The sea level data is collected continuously at one or two tide gauges in each of the 13 PICs. The land motion data is collected continuously at one or two Global Navigation Satellite System (GNSS) stations in each of the 13 PICs. The height difference between the tide gauges and GNSS stations is observed once every 18 months (approximately). The data is then analysed to produce sea level information-based products (e.g. tide calendars) and to inform about motion of the land (e.g. for coastal infrastructure planning). </div><div>The PSLGM project involves Australian science agencies (Bureau of Meteorology (Bureau) and Geoscience Australia (GA)) working in partnership with regional organisations (Pacific Community (SPC)), and Pacific government ministries (meteorology and land and survey departments).</div><div><br></div><div>This GA Record reports findings regarding the absolute vertical rate of movement (i.e. the rate at which the land is moving up or down with respect to the centre of the Earth) of 13 Pacific Island Countries tide gauges over the period 2003 – 2022 based on the analysis of Global Navigation Satellite System (GNSS) data and levelling data. </div><div><br></div>
-
<div>The Australian Bureau of Meteorology (BoM), Geoscience Australia (GA) and the Pacific Community (SPC) work together on the Australian Aid funded Pacific Sea Level and Geodetic Monitoring Project (PSLGMP). The project is focused on determining the long-term variation in sea level through observation and analysis of changes in the height of the land (using Global Navigation Satellite System (GNSS) data) and changes in the sea level (using tide gauges managed and operated by the BoM. It is the role of GA and SPC to provide information about ‘absolute’ movement of the tide gauge (managed by BoM) using GNSS to continuously monitor land motion and using levelling (SPC) to measure the height difference between the tide gauge and GNSS pillar every 18 months.</div><div><br></div><div>Land movement caused by earthquakes, subsidence and surface uplift have an important effect on sea level observations at tide gauges. For example, a tide gauge connected to a pier which is subsiding at a rate of 5 mm per year would be observed as a rate of 5 mm per year of sea level rise at the tide gauge. Because of this, it is important to measure, and account for, the movement of land when measuring ‘absolute’ sea level variation - the change in the sea level relative to the centre of the Earth. Relative sea level variation on the other hand is measured relative to local buildings and landmass around the coastline.</div><div>Geoscience Australia’s work enables more accurate 'absolute' sea level estimates by providing observations of land motion which can be accounted for by BoM when analysing the tide gauge data.</div><div><br></div><div>This report provides the results of the GNSS monument monitoring survey & high precision level survey completed between the Sea Level Fine Resolution Acoustic Measuring Equipment (SEAFRAME) tide gauge and the GNSS Continuously Operation Reference Station (CORS) in Funafuti, Tuvalu in October of 2019. It also provides an updated height of the tide gauge derived from GNSS time series analysis and precise levelling observations.</div><div><br></div>