Murray Basin Hydrogeological Project : progress report 5 for half year ending 31 March 1981
The groundwater modelling sub-committee set up by the Steering Committee in June 1980, met in October and recommended that a preliminary model of the Basin should be attempted; it should contain 3 layers, with a 10 x 10 grid (300 nodes) and have the aim of increasing theaccuracy of solutions at later stages by decreasing the grid size.
The sub-committee proposed that a whole basin model be attempted by the South Australian Department of Mines & Energy using a finite element method, and by the Water Resources Commission of New South Wales using a finite difference approach; the methods could then be compared before a more elaborate model was tried.
Simple
Identification info
- Date (Publication)
- 1981-01-01T00:00:00
- Citation identifier
- Geoscience Australia Persistent Identifier/https://pid.geoscience.gov.au/dataset/ga/13900
- Cited responsible party
-
Role Organisation / Individual Name Details Publisher Bureau of Mineral Resources, Geology and Geophysics
Canberra Author Perry, W.J.
1
- Name
-
Record
- Issue identification
-
1981/030
- Point of contact
-
Role Organisation / Individual Name Details Custodian EGD
Owner Commonwealth of Australia (Geoscience Australia)
Custodian Commonwealth of Australia (Geoscience Australia)
Voice
- Topic category
-
- Geoscientific information
- Maintenance and update frequency
- Unknown
Resource format
- Title
-
Product data repository: Various Formats
- Website
-
Data Store directory containing the digital product files
Data Store directory containing one or more files, possibly in a variety of formats, accessible to Geoscience Australia staff only for internal purposes
- Keywords
-
-
GA Publication
-
Record
-
- Theme
-
-
hydrogeology
-
- Australian and New Zealand Standard Research Classification (ANZSRC)
-
-
Earth Sciences
-
- Keywords
-
-
Published_External
-
Resource constraints
- Title
-
Creative Commons Attribution 4.0 International Licence
- Alternate title
-
CC-BY
- Edition
-
4.0
- Access constraints
- License
- Use constraints
- License
Resource constraints
- Title
-
Australian Government Security ClassificationSystem
- Edition date
- 2018-11-01T00:00:00
- Classification
- Unclassified
- Language
- English
- Character encoding
- UTF8
Distribution Information
- Distributor contact
-
Role Organisation / Individual Name Details Distributor Commonwealth of Australia (Geoscience Australia)
Voice
- OnLine resource
-
Download the Record (pdf)
Download the Record (pdf)
- Distribution format
-
-
pdf
-
Resource lineage
- Statement
-
Legacy product, lineage not available
- Hierarchy level
- Non geographic dataset
- Other
-
GA Publication
- Description
-
Legacy product, source data not available.
Metadata constraints
- Title
-
Australian Government Security ClassificationSystem
- Edition date
- 2018-11-01T00:00:00
- Classification
- Unclassified
Metadata
- Metadata identifier
-
urn:uuid/a05f7892-7692-7506-e044-00144fdd4fa6
- Title
-
GeoNetwork UUID
- Language
- English
- Character encoding
- UTF8
- Contact
-
Role Organisation / Individual Name Details Point of contact Commonwealth of Australia (Geoscience Australia)
Voice
Type of resource
- Resource scope
- Document
- Name
-
GA Record
Alternative metadata reference
- Title
-
Geoscience Australia - short identifier for metadata record with
uuid
- Citation identifier
- eCatId/13900
- Date info (Revision)
- 2018-04-20T06:12:58
- Date info (Creation)
- 1999-08-11T00:00:00
Metadata standard
- Title
-
AU/NZS ISO 19115-1:2014
Metadata standard
- Title
-
ISO 19115-1:2014
Metadata standard
- Title
-
ISO 19115-3
- Title
-
Geoscience Australia Community Metadata Profile of ISO 19115-1:2014
- Edition
-
Version 2.0, September 2018
- Citation identifier
- https://pid.geoscience.gov.au/dataset/ga/122551