Authors / CoAuthors
Perry, W.J.
Abstract
The groundwater modelling sub-committee set up by the Steering Committee in June 1980, met in October and recommended that a preliminary model of the Basin should be attempted; it should contain 3 layers, with a 10 x 10 grid (300 nodes) and have the aim of increasing theaccuracy of solutions at later stages by decreasing the grid size. The sub-committee proposed that a whole basin model be attempted by the South Australian Department of Mines & Energy using a finite element method, and by the Water Resources Commission of New South Wales using a finite difference approach; the methods could then be compared before a more elaborate model was tried.
Product Type
document
eCat Id
13900
Contact for the resource
Custodian
Owner
Custodian
Cnr Jerrabomberra Ave and Hindmarsh Dr GPO Box 378
Canberra
ACT
2601
Australia
Keywords
-
- GA PublicationRecord
- ( Theme )
-
- hydrogeology
- Australian and New Zealand Standard Research Classification (ANZSRC)
-
- Earth Sciences
-
- Published_External
Publication Date
1981-01-01T00:00:00
Creation Date
Security Constraints
Legal Constraints
Status
Purpose
Maintenance Information
unknown
Topic Category
geoscientificInformation
Series Information
Record 1981/030
Lineage
Legacy product, lineage not available
Parent Information
Extents
Reference System
Spatial Resolution
Service Information
Associations
Source Information
Legacy product, source data not available.